TeksoftTeksoft
  • Home
  • Services
    • SAP Education
    • EHR Training
    • Change Management
    • eLearning
      • Distance Learning
      • Educational Games
      • Multimedia Solutions
      • Sample eLearning Courses
  • Case Studies
  • Clients
  • Knowledge
    • Webinars
    • Training Blog
    • SAP Glossary
  • About Us
    • Our Story
    • Our Strategy
    • Our Ethics Policy
  • Blog
  • Contact Us

Production hor.

February 15, 2016teksoft

The system does not plan SNP production within this horizon. That is, the Supply Network Planning does not create SNP planned orders in the SNP key figure for (planned) production, but shifts production to the first day beyond the specified production horizon. In contrast to the time stream, this horizon determines when Supply Network Planning ends and PP/DS begins.

Previous post Production date Next post Production Horizon

footer_logo

 

Teksoft Ventures
PO Box 111851
Naples, Florida 34108
Phone: 630-842-8219

affiliations

Home
Case Studies
About Us
Blog
Contact Us

Email
Facebook
Twitter
Google+
LinkedIn
Copyright 2019 Teksoft Ventures
SAP®, R/3®, mySAP®, mySAP.com®, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. Teksoft Ventures is an equal opportunity employer.