Teksoft Ventures
PO Box 111851
Naples, Florida 34108
Phone: 630-842-8219
The system does not plan SNP production within this horizon. That is, the Supply Network Planning does not create SNP planned orders in the SNP key figure for (planned) production, but shifts production to the first day beyond the specified production horizon. In contrast to the time stream, this horizon determines when Supply Network Planning ends and PP/DS begins.

Teksoft Ventures
PO Box 111851
Naples, Florida 34108
Phone: 630-842-8219
