- R -
Range of coverage (production planning)Number of days a company plans to have a material available. This can be based on anticipated requirements or actual usage. Range of coverage in periodPeriod for which range of coverage analysis is to be performed. Range of coverage toDate by which the outline agreement is likely to be fulfilled. RateDetermines how the system calculates a condition value (absolute or percentage). Rate-based planningComes under the capacity planning type bottleneck resources for production rate related production. Rate-based planning generally takes place via rate routings. RCvgReceipt range of coverage is the number of days the stock will last when specified receipts are added to current stock. Read address of ship-to partyShip-to party address in the master record. ReasonReason for changing payroll master data. Reason for cancellationReason something was cancelled. Reason for movementReason a material was moved from one location to another. Reason for mvt.Reason a material was moved from one location to another. Reason for orderingIndicates the reason for creating the sales document. Reason for rejectionReason goods were rejected as defined by the system. Rebate arrangementAgreements on rebates between the vendor and a customer. Rebate recipientParty who receives the rebate. Rebate settlement statusStatus of rebates. RebatesA special discount paid retroactively to a customer. The discount is based on having achieved a sales volume over a specified period of time or having met certain performance criteria such as creating an end display, advertising, or shelf space. Rec. CCtrCost center which is credited during an allocation. Rec. orderOrder which is to be debited on an allocation. Rec./reqd qtyStock Availability Overview: Depending on the relevant MRP element, this value specifies either the quantity received or the quantity required. Rec./reqd.qtyStock Availability Overview: Depending on the relevant MRP element, this value specifies either the quantity received or the quantity required. Receipt coverageReceipt coverage date is the date to which coverage will last when firmed receipts are included. Receiv. PlantReceiving plant. Plant that receives the goods (the opposite of issuing plant). ReceiverThe cost object to which costs are allocated. Examples include cost centers, internal orders, etc. Rules are established that identify how costs are allocated, either in fixed amounts, fixed percentages, fixed portions, or variable portions. Receiver numberNumber of settlement receiver listed in settlement rules. Receiver ruleDetermines how receiving tracing factors are determined. Receiver WBS elementWBS element to which costs are transferred. Receiver weightingCalculates the percentage of allocation of a cost to a receiving cost center as part of tracing factors within a cycle segment. Receiver yearYear to which unexpended budgeted funds are transferred. Receiving mat.Material that is being received. Receiving plantPlant that receives the goods (the opposite of issuing plant). RecipeInstructions for a production process. Manufacturing recipes describe a production process. Non-manufacturing recipes check that all functions of a resource are working or perform the clearing or changeover of a line. Recipe groupGroup in which the master recipe is allocated. RecipientPerson who is to receive the material or service. Reconciliation accountGeneral ledger account to which transactions in the subsidiary ledgers (such as in the customer, vendor, or assets areas) are automatically updated. This account cannot be manually posted to. Recurring documentSAP document that is not posted upon creation, but stored. It is then copied and posted at regular intervals (for example monthly or quarterly). Recurring documents are used when the account and amount remains the same, such as insurance or rent payments. Recurring entriesEntries that are repeated at regular intervals. The recurring entry program posts recurring entries based on recurring entry documents. Examples are rent, insurance, and loan payments. Recurs. allowedIndicator that allows components to be used multiple times in a BOM at different levels. Recv. SLocReceiving/issuing storage location. The receiving storage location is the location that is to receive the goods. The issuing storage location is the location whose stock is to be reduced by some amount. ReductionA decrease in the lead time of a routing, order, or network in scheduling. Reduction levelReduction level specifying whether and how the queue time is to be reduced, if necessary. Ref. productsConfigurable product for which a product variant is created. Ref.doc.This field allows for further clarification of an entry by reference to other sources of information, either internal or external to SAP. ReferenceAllows for further clarification of an entry by reference to other sources of information, either internal or external to SAP. Any SAP-posted document number can be used as a "reference" when entering a new document. Reference CharA characteristic that is created with reference to a table field. The characteristic takes on the attributes of the table field, as defined in the ABAP dictionary. Reference char.A characteristic that is created with reference to a table field. The characteristic takes on the attributes of the table field, as defined in the ABAP dictionary. Reference dateDate when the maintenance work was completed. Reference no.Indicator used to specify that the reference document field will be used as a criteria for selecting open items for payment. Reference quantityThe quantity used as a reference. Reference timeDate and time at which the system reads the equipment location and account assignment data when you complete a maintenance notification, and under which it sorts the maintenance notification in the equipment usage history. Reference TypeType of relationship between two activities. The reference type defines the behavior of the successor activity in terms of start and end. ReferenceDateDate when the maintenance work was completed. RefundReturn of a submitted payment or portion of a submitted payment to a customer. Refurbishment Work Order (PM60)A type of work order used for refurbishment and reconditioning of components managed in inventory. RegionIn the U.S., state in which the vendor or customer resides. Region codeCode assigned within SAP that defines a specific region. Region codesCode assigned within SAP that defines a specific region. ReleaseThe approval and release of a purchase order to a vendor for execution. Release codeLevel of authorization required. Release dateDate on which the ordering process is to be initiated based on the purchase requisition. Release prerequisite fulfilledPrerequisites for purchase order release have been completed. Release profileContains information that is used for the release of the demand plan from Demand Planning to Supply Network Planning. Released backorderBackorder whose items have been confirmed due to availability. Releasing partnerPartner authorized to release orders against contracts. Rem. shelf lifeRemaining shelf life of a material. Remaining shelf lifeRemaining shelf life of a material. Remaining workWork left to complete. Reorder pointStock quantity below which a new order is placed for the material. REP. LABORRefers to the activity type labor assigned to the rate routing. REPETITIVE LABORRefers to the activity type labor assigned to the rate routing. Repetitive MaintenancePreventive maintenance. Repetitive manufacturing productionA method of production based on creating the same unit many times. Report groupA group of reports and parallel reports from the same library which are processed together in the run. Report painterA graphical user interface / reporting tool developed by SAP to make report writing easy for end users. Report treeList of SAP R/3 standard reports organized into categorical hierarchies. Reported byPerson or organization that reported something. Reporting pointRepresents a strategic point in the manufacturing process where backflushes are performed and WIP is generated. RepostingUsed to move assigned costs between cost objects. Commonly used to fix posting errors. Should only occur at period end close for reporting purposes. Req. deliv dateDate requested by customer for delivery of ordered goods or services. Req. deliv. dateDate requested by customer for delivery of ordered goods or services. Req. deliv.dateDate requested by customer for delivery of ordered goods or services. Req. startEarliest possible point in time for the processing of a work item to start. Req.deliv.dateDate requested by customer for delivery of ordered goods or services. ReqDateIn a reservation, the date on which the requested material is to be withdrawn from the warehouse or stores. May also be referred to as the "need date". In manufacturing and plant maintenance it is the date when a resources will be needed to perform a task. Reqmnt qtyThe quantity of component materials required to produce a quantity of the expected order. Reqmts qtyThe quantity of component materials required to produce a quantity of the expected order. Reqmts quantityThe quantity of component materials required to produce a quantity of the expected order. Reqmts.dtIn a reservation, the date on which the requested material is to be withdrawn from the warehouse or stores. May also be referred to as the "need date". In manufacturing and plant maintenance it is the date when a resources will be needed to perform a task. Reqmts.dt.In a reservation, the date on which the requested material is to be withdrawn from the warehouse or stores. May also be referred to as the "need date". In manufacturing and plant maintenance it is the date when a resources will be needed to perform a task. ReqmtsDateIn a reservation, the date on which the requested material is to be withdrawn from the warehouse or stores. May also be referred to as the "need date". In manufacturing and plant maintenance it is the date when a resources will be needed to perform a task. Reqrd. qtyThe quantity of component materials required to produce a quantity of the expected order. RequestAn instruction from an external host to TRM to process the listed material. Request for quotationInvites a vendor to submit a quotation for material or services bought repetitively, a new material or service, or items or services with high value. Requested qtyQuantity to be removed from stock or placed into stock in an alternative unit of measure. Required endDeadline by which the processing of a work item should be terminated. RequirementIdentifies the required skills, knowledge, and abilities for an object (for example: job, position, task, work center). Requirement dateIn a reservation, the date on which the requested material is to be withdrawn from the warehouse or stores. May also be referred to as the "need date". In manufacturing and plant maintenance it is the date when a resources will be needed to perform a task. Requirement numberNumerical value used to identify a planned independent requirement. Requirement qtyThe quantity of component materials required to produce a quantity of the expected order. Requirement quantityThe quantity of component materials required to produce a quantity of the expected order. Requirement timeTime required. RequirementsIdentifies the required skills, knowledge, and abilities for an object (for example: job, position, task, work center). Requirements vValue of stock anticipated as required in a given period. Requirements valueValue of stock anticipated as required in a given period. RequisitionerCode for the individual who created the requisition. RescheduleDetailed scheduling activity used to determine a new date or new resources for a scheduled operation, on which the operation should be processed. ReservationDesignation of a stocked component for use. A component reservation may or may not generate a requisition for purchase of a replacement part. Reservation/Purc.reqReservation or purchase requisition. Reserve fundsManual postings can be made to set aside amounts for unexpected events. Examples include Bad Debt Reserve, Start-Up Cost Reserve, Pending Litigation Reserve, etc. ReservedStock cateogory. Material is reserved and unavailable for general use. ReservNoNumber given when a reservation is created. ResourceMeans of production and persons involved in a production process that have capacities assigned to them. Resource Availability tillAvailability of resources until a given period. Resource Availability Till TimeAvailability of resources until a given period. Resource categoryIdentifies the category to which the resource will be assigned. Resources - Availability fromAvailability of resources from a given period. ResponsiblePerson responsible for one or more supply areas. ResultActual measured values of an inspection. ReturnA decrease in funds allocated to an investment program. ReturnsNet value of returns. Returns qtyQuantity of items returned. Revaluat.For FI/AA, it is an increase to asset values to allow for a reduction in the value of a currency due to inflation. RevaluationFor FI/AA, it is an increase to asset values to allow for a reduction in the value of a currency due to inflation. Revenue elementObject to which revenues resulting from sales orders are posted. ReversalThe process of reversing a document by posting another document with equal amounts to the opposite sides of the same accounts. Reversal dateDate on which the reverse posting is to be made. Reversal reasonThe reason that an entry is reversed. ReverseDocA document that is generated when reversing a posting. RevisionA period of time during which a plant or manufacturing process (or part thereof) is temporarily shutdown, so that service and/or equipment maintenance tasks can be performed. Has a predefined start and end date Revision end dateDate the necessary revisions are to be completed. Revision start dateDate the necessary revisions are set to begin. RFQ dateDate on which an RFQ is created. RFQ itemsNumber of all items in the request for quotations. RFQ quantityTotal quantity in a request for quotation. RFQ/typeClassification that determines whether the RFQ is for a material or service. Risk categoryCode used to classify customers according to commercial risk. RoomNumber identifying the specific room where the equipment or functional location is located. ROpNumber of the return operation. Rough-cut capacity planRecord future requirements of work center capacities, materials, production resources/tools, and costs. Rough-cut capacity planningEvaluation of capacity (machine, labor, etc) for key resources based on a Master Production Schedule. Rounding profileMethod used to round proposed quantities to deliverable units in Planning. RouteNumber of days a shipment is expected to be in transit between the delivering plant and the customer's desired destination. RoutingA set of operations that must be performed in sequence to manufacture a product. RSLRem. shelf life. Rtns itemsNumber of items that have been returned. Run dateThe date the payment run was made. Run schedule headerProduction order in Repetitive Production Planning. Run schedule quantityQuantity to be manufactured in a certain period along with the cost collector for production of that quantity.
|